Like us on Facebook@HpoolResidents
Follow us on Twitter@HpoolResidents

Location: Home / Sport / Summer work has already got underway at Pools with an enhanced irrigation system being installed in

Summer work has already got underway at Pools with an enhanced irrigation system being installed in - Monday 15 May 2017

By Hartlepool United FC Your Logo

Summer work has already got underway at Pools with an enhanced irrigation system being installed in

Summer work has already got underway at Pools with an enhanced irrigation system being installed in the pitch... Work has already begun to ensure the pitch at The Northern Gas and Power Stadium is at its best once again for the start of the 201718 campaign.

Keep up to date with this update by visiting the Hartlepool United Facebook Page via www.facebook.com/hartlepoolunited

hartlepool

united

football

club

Comments

Please Sign in to Post a Comment